
Infrastructure
TSD - Campo Maior a Coivaras
Double paving and surface treatment on the PI - 215 highway, stretch from Campo Maior to Coivaras, 27.887 km long


TSD - São Miguel do Tapuio a Pimenteiras
Paving and double surface treatment on the PI - 120 highway, stretch from São Miguel do Tapuio to Pimenteiras, 78.61 km long. Of these, we carried out 40 km.


TSD - Regeneração a Povoado Jacaré
Paving and double surface treatment on the PI - 236 highway, Regeneration Section to Povoado Jacaré with an extension of 18 km, of which we carried out 15 km


